Industry Experience and Innovative Thinking

At CCR Global, we take immense pride in the hard work that goes into each and every project we undertake. From start to finish, we ensure that we meet the highest standards of quality and excellence, fuelling our drive to surpass our own achievements, and delivering the results to our clients. Discover more about our main projects below.

Planned as the UK’s second purpose-built high-speed train line following HS1, the HS2 project will link London with the West Midlands in the largest infrastructure project in Europe.
Manchester's Terminal 2, a key part of the £1.3bn Airport Transformation Programme, has earned accolades in the esteemed Prix Versailles for its innovative design.
As a crucial component of the King Abdulaziz Project for Riyadh Public Transport, the rapid transit system comprises six metro lines spanning a total length of 109 miles with 85 stations.
The OVO Hydro Arena in Glasgow, formerly SSE Hydro, is a renowned entertainment venue with a 12,000-seat capacity.
Westmark Tower in the West End of London is a 29-storey commercial and office building with a curving structure taking full advantage of the panoramic views of London.
Major refurbishment of an existing office building located in the City of London with views of St Paul’s Cathedral.
The design, supply and installation of the complete envelope for two 10-storey luxury residential buildings, part of the Royal Warwick Square development, located in the heart of the Royal Borough of Kensington & Chelsea, London.
Playing a key part in Riyadh’s urban development, Al Faisaliyah shopping centre is part of the Al Faisaliyah Complex centred around Saudi Arabia’s first skyscraper.
Cashmere Wharf, the tallest structure in the prestigious London Dock complex in Wapping, is a 26-storey 141 dwelling residential building.
This project involved the construction of a new hospital building in the city centre to replace the existing facility, aiming to provide enhanced conditions for serving the Liverpool population.